{"id":146,"date":"2015-09-01T21:19:42","date_gmt":"2015-09-01T21:19:42","guid":{"rendered":"http:\/\/whub49.webhostinghub.com\/~peritu7\/?page_id=146"},"modified":"2015-12-13T01:55:20","modified_gmt":"2015-12-13T01:55:20","slug":"faith-based","status":"publish","type":"page","link":"https:\/\/www.peritusengineers.com\/index.php\/recent-projects\/faith-based\/","title":{"rendered":"Faith Based"},"content":{"rendered":"<div id=\"pl-146\"  class=\"panel-layout\" ><div id=\"pg-146-0\"  class=\"panel-grid panel-no-style\" ><div id=\"pgc-146-0-0\"  class=\"panel-grid-cell\" ><div id=\"panel-146-0-0-0\" class=\"so-panel widget widget_black-studio-tinymce widget_black_studio_tinymce panel-first-child panel-last-child\" data-index=\"0\" ><div class=\"panel-widget-style panel-widget-style-for-146-0-0-0\" ><h3 class=\"widget-title\">First Baptist Church &#8211; Greenville, SC<\/h3><div class=\"textwidget\"><p style=\"text-align: justify;\">Peritus has been involved with multiple projects at the First Baptist Church in Greenville.\u00a0 The chilled water project included improvements to the existing chilled water distribution system and integration of a new chilled water plant to supplement the existing main chilled water loop.\u00a0 This project resulted in increased chilled water capacity and improved energy efficiency.<br \/> In a separate project, Peritus provided the HVAC and plumbing design for the new Activities Center.\u00a0 The 2-story, 40,000 SF facility includes a multi-purpose gym with a full-size basketball court, fitness rooms, locker rooms, classrooms, offices and a concession area.\u00a0 Our scope of work included the following: connection of the new building HVAC system to main building system, replacement of the existing chiller and reconfiguration of the piping systems to provide additional tonnage for the new facility extensions<\/p>\n<\/div><\/div><\/div><\/div><div id=\"pgc-146-0-1\"  class=\"panel-grid-cell\" ><div id=\"panel-146-0-1-0\" class=\"so-panel widget widget_sow-slider panel-first-child panel-last-child\" data-index=\"1\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-slider so-widget-sow-slider-default-53fd0f98de19-146\"\n\t\t\t\n\t\t><div class=\"sow-slider-base\" style=\"display: none\"><ul\n\t\t\t\t\tclass=\"sow-slider-images\"\n\t\t\t\t\tdata-settings=\"{&quot;pagination&quot;:true,&quot;speed&quot;:800,&quot;timeout&quot;:8000,&quot;paused&quot;:false,&quot;pause_on_hover&quot;:false,&quot;swipe&quot;:true,&quot;nav_always_show_desktop&quot;:&quot;&quot;,&quot;nav_always_show_mobile&quot;:&quot;&quot;,&quot;breakpoint&quot;:&quot;780px&quot;,&quot;unmute&quot;:false,&quot;anchor&quot;:null}\"\n\t\t\t\t\t\t\t\t\t>\t\t<li class=\"sow-slider-image\" style=\"\" >\n\t\t\t\t\t\t<div class=\"sow-slider-image-container\">\n\t\t\t\t<div class=\"sow-slider-image-wrapper\" style=\"max-width: 640px\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"sow-slider-image-foreground-wrapper\">\n\t\t\t\t\t\t<img width=\"640\" height=\"480\" src=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/08\/FBCGnvl.jpg\" class=\"sow-slider-foreground-image skip-lazy\" alt=\"\" decoding=\"async\" loading=\"eager\" style=\"\" srcset=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/08\/FBCGnvl.jpg 640w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/08\/FBCGnvl-300x225.jpg 300w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/li>\n\t\t\t\t<li class=\"sow-slider-image\" style=\"\" >\n\t\t\t\t\t\t<div class=\"sow-slider-image-container\">\n\t\t\t\t<div class=\"sow-slider-image-wrapper\" style=\"max-width: 4000px\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"sow-slider-image-foreground-wrapper\">\n\t\t\t\t\t\t<img width=\"4000\" height=\"3000\" src=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/First-Baptist-Church-Greenville-9.jpg\" class=\"sow-slider-foreground-image skip-lazy\" alt=\"\" decoding=\"async\" loading=\"eager\" style=\"\" srcset=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/First-Baptist-Church-Greenville-9.jpg 4000w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/First-Baptist-Church-Greenville-9-300x225.jpg 300w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/First-Baptist-Church-Greenville-9-1024x768.jpg 1024w\" sizes=\"(max-width: 4000px) 100vw, 4000px\" \/>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/li>\n\t\t\t\t<li class=\"sow-slider-image\" style=\"\" >\n\t\t\t\t\t\t<div class=\"sow-slider-image-container\">\n\t\t\t\t<div class=\"sow-slider-image-wrapper\" style=\"max-width: 4000px\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"sow-slider-image-foreground-wrapper\">\n\t\t\t\t\t\t<img width=\"4000\" height=\"3000\" src=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/First-Baptist-Church-Greenville-1.jpg\" class=\"sow-slider-foreground-image skip-lazy\" alt=\"\" decoding=\"async\" loading=\"eager\" style=\"\" srcset=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/First-Baptist-Church-Greenville-1.jpg 4000w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/First-Baptist-Church-Greenville-1-300x225.jpg 300w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/First-Baptist-Church-Greenville-1-1024x768.jpg 1024w\" sizes=\"(max-width: 4000px) 100vw, 4000px\" \/>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/li>\n\t\t<\/ul>\t\t\t\t<ol class=\"sow-slider-pagination\">\n\t\t\t\t\t\t\t\t\t\t\t<li><a href=\"#\" data-goto=\"0\" aria-label=\"display slide 1\"><\/a><\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li><a href=\"#\" data-goto=\"1\" aria-label=\"display slide 2\"><\/a><\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li><a href=\"#\" data-goto=\"2\" aria-label=\"display slide 3\"><\/a><\/li>\n\t\t\t\t\t\t\t\t\t<\/ol>\n\n\t\t\t\t<div class=\"sow-slide-nav sow-slide-nav-next\">\n\t\t\t\t\t<a href=\"#\" data-goto=\"next\" aria-label=\"next slide\" data-action=\"next\">\n\t\t\t\t\t\t<em class=\"sow-sld-icon-thin-right\"><\/em>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\n\t\t\t\t<div class=\"sow-slide-nav sow-slide-nav-prev\">\n\t\t\t\t\t<a href=\"#\" data-goto=\"previous\" aria-label=\"previous slide\" data-action=\"prev\">\n\t\t\t\t\t\t<em class=\"sow-sld-icon-thin-left\"><\/em>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div><\/div><\/div><\/div><\/div><div id=\"pg-146-1\"  class=\"panel-grid panel-no-style\" ><div id=\"pgc-146-1-0\"  class=\"panel-grid-cell panel-grid-cell-empty panel-grid-cell-mobile-last\" ><\/div><div id=\"pgc-146-1-1\"  class=\"panel-grid-cell panel-grid-cell-empty\" ><\/div><\/div><div id=\"pg-146-2\"  class=\"panel-grid panel-no-style\" ><div id=\"pgc-146-2-0\"  class=\"panel-grid-cell panel-grid-cell-empty panel-grid-cell-mobile-last\" ><\/div><div id=\"pgc-146-2-1\"  class=\"panel-grid-cell panel-grid-cell-empty\" ><\/div><\/div><div id=\"pg-146-3\"  class=\"panel-grid panel-no-style\" ><div id=\"pgc-146-3-0\"  class=\"panel-grid-cell\" ><div id=\"panel-146-3-0-0\" class=\"so-panel widget widget_black-studio-tinymce widget_black_studio_tinymce panel-first-child panel-last-child\" data-index=\"2\" ><div class=\"panel-widget-style panel-widget-style-for-146-3-0-0\" ><h3 class=\"widget-title\">Northside Baptist Church &#8211; Greenwood, SC<\/h3><div class=\"textwidget\"><div style=\"text-align: justify;\" data-canvas-width=\"438.9844773670589\">Northside Baptist Church in Greenwood, SC is a 48,087 SF facility that includes a sanctuary with theater style seating to accommodate approximately 1,200 people.\u00a0 The support areas include an information area, a coffee bar, a book store and a guest service desk.\u00a0 Our scope of work consisted of approximately 75 HP of boiler and 250 tons of chilled water along with primary\/secondary pumping and additional tonnage for future use.<\/div>\n<div style=\"text-align: justify;\" data-canvas-width=\"438.9844773670589\">\u00a0<\/div>\n<div style=\"text-align: justify;\" data-canvas-width=\"438.9844773670589\"><em>Photos provided courtesy of LS3P.<\/em><\/div>\n<\/div><\/div><\/div><\/div><div id=\"pgc-146-3-1\"  class=\"panel-grid-cell\" ><div id=\"panel-146-3-1-0\" class=\"so-panel widget widget_sow-slider panel-first-child panel-last-child\" data-index=\"3\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-slider so-widget-sow-slider-default-53fd0f98de19-146\"\n\t\t\t\n\t\t><div class=\"sow-slider-base\" style=\"display: none\"><ul\n\t\t\t\t\tclass=\"sow-slider-images\"\n\t\t\t\t\tdata-settings=\"{&quot;pagination&quot;:true,&quot;speed&quot;:800,&quot;timeout&quot;:8000,&quot;paused&quot;:false,&quot;pause_on_hover&quot;:false,&quot;swipe&quot;:true,&quot;nav_always_show_desktop&quot;:&quot;&quot;,&quot;nav_always_show_mobile&quot;:&quot;&quot;,&quot;breakpoint&quot;:&quot;780px&quot;,&quot;unmute&quot;:false,&quot;anchor&quot;:null}\"\n\t\t\t\t\t\t\t\t\t>\t\t<li class=\"sow-slider-image\" style=\"\" >\n\t\t\t\t\t\t<div class=\"sow-slider-image-container\">\n\t\t\t\t<div class=\"sow-slider-image-wrapper\" style=\"max-width: 2083px\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"sow-slider-image-foreground-wrapper\">\n\t\t\t\t\t\t<img width=\"2083\" height=\"1250\" src=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/12\/NorthsideBaptist1.jpg\" class=\"sow-slider-foreground-image skip-lazy\" alt=\"\" decoding=\"async\" loading=\"eager\" style=\"\" srcset=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/12\/NorthsideBaptist1.jpg 2083w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/12\/NorthsideBaptist1-300x180.jpg 300w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/12\/NorthsideBaptist1-1024x614.jpg 1024w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/12\/NorthsideBaptist1-2000x1200.jpg 2000w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/12\/NorthsideBaptist1-1000x600.jpg 1000w\" sizes=\"(max-width: 2083px) 100vw, 2083px\" \/>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/li>\n\t\t\t\t<li class=\"sow-slider-image\" style=\"\" >\n\t\t\t\t\t\t<div class=\"sow-slider-image-container\">\n\t\t\t\t<div class=\"sow-slider-image-wrapper\" style=\"max-width: 5625px\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"sow-slider-image-foreground-wrapper\">\n\t\t\t\t\t\t<img width=\"5625\" height=\"3750\" src=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Northside-Baptist-Church-2.jpg\" class=\"sow-slider-foreground-image skip-lazy\" alt=\"\" decoding=\"async\" loading=\"eager\" style=\"\" srcset=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Northside-Baptist-Church-2.jpg 5625w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Northside-Baptist-Church-2-300x200.jpg 300w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Northside-Baptist-Church-2-1024x683.jpg 1024w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Northside-Baptist-Church-2-272x182.jpg 272w\" sizes=\"(max-width: 5625px) 100vw, 5625px\" \/>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/li>\n\t\t\t\t<li class=\"sow-slider-image\" style=\"\" >\n\t\t\t\t\t\t<div class=\"sow-slider-image-container\">\n\t\t\t\t<div class=\"sow-slider-image-wrapper\" style=\"max-width: 4500px\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"sow-slider-image-foreground-wrapper\">\n\t\t\t\t\t\t<img width=\"4500\" height=\"3000\" src=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Northside-Baptist-Church-3.jpg\" class=\"sow-slider-foreground-image skip-lazy\" alt=\"\" decoding=\"async\" loading=\"eager\" style=\"\" srcset=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Northside-Baptist-Church-3.jpg 4500w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Northside-Baptist-Church-3-300x200.jpg 300w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Northside-Baptist-Church-3-1024x683.jpg 1024w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Northside-Baptist-Church-3-272x182.jpg 272w\" sizes=\"(max-width: 4500px) 100vw, 4500px\" \/>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/li>\n\t\t<\/ul>\t\t\t\t<ol class=\"sow-slider-pagination\">\n\t\t\t\t\t\t\t\t\t\t\t<li><a href=\"#\" data-goto=\"0\" aria-label=\"display slide 1\"><\/a><\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li><a href=\"#\" data-goto=\"1\" aria-label=\"display slide 2\"><\/a><\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li><a href=\"#\" data-goto=\"2\" aria-label=\"display slide 3\"><\/a><\/li>\n\t\t\t\t\t\t\t\t\t<\/ol>\n\n\t\t\t\t<div class=\"sow-slide-nav sow-slide-nav-next\">\n\t\t\t\t\t<a href=\"#\" data-goto=\"next\" aria-label=\"next slide\" data-action=\"next\">\n\t\t\t\t\t\t<em class=\"sow-sld-icon-thin-right\"><\/em>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\n\t\t\t\t<div class=\"sow-slide-nav sow-slide-nav-prev\">\n\t\t\t\t\t<a href=\"#\" data-goto=\"previous\" aria-label=\"previous slide\" data-action=\"prev\">\n\t\t\t\t\t\t<em class=\"sow-sld-icon-thin-left\"><\/em>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div><\/div><\/div><\/div><\/div><div id=\"pg-146-4\"  class=\"panel-grid panel-no-style\" ><div id=\"pgc-146-4-0\"  class=\"panel-grid-cell panel-grid-cell-empty panel-grid-cell-mobile-last\" ><\/div><div id=\"pgc-146-4-1\"  class=\"panel-grid-cell panel-grid-cell-empty\" ><\/div><\/div><div id=\"pg-146-5\"  class=\"panel-grid panel-no-style\" ><div id=\"pgc-146-5-0\"  class=\"panel-grid-cell panel-grid-cell-empty panel-grid-cell-mobile-last\" ><\/div><div id=\"pgc-146-5-1\"  class=\"panel-grid-cell panel-grid-cell-empty\" ><\/div><\/div><div id=\"pg-146-6\"  class=\"panel-grid panel-no-style\" ><div id=\"pgc-146-6-0\"  class=\"panel-grid-cell\" ><div id=\"panel-146-6-0-0\" class=\"so-panel widget widget_black-studio-tinymce widget_black_studio_tinymce panel-first-child panel-last-child\" data-index=\"4\" ><div class=\"panel-widget-style panel-widget-style-for-146-6-0-0\" ><h3 class=\"widget-title\">Simpsonville First Baptist Church &#8211; Simpsonville, SC<\/h3><div class=\"textwidget\"><div data-canvas-width=\"438.9844773670589\">\n<div style=\"text-align: justify;\" data-canvas-width=\"481.50086671235306\">The new sanctuary for Simpsonville First Baptist Church is located in downtown Simpsonville.\u00a0 The facility is approximately 35,800 SF and is comprised of a 1,200 seat auditorium, lobby area, orchestra and choir practice rooms. Peritus provided the HVAC and plumbing design which included the addition of approximately 40 HP of boiler along with 160 tons of chilled water.\u00a0 An additional 37 ton chilled water system was also included to assist with cooling demands.<\/div>\n<\/div>\n<div style=\"text-align: justify;\" data-canvas-width=\"481.50086671235306\">\u00a0<\/div>\n<div style=\"text-align: justify;\" data-canvas-width=\"481.50086671235306\"><em>Photos provided courtesy of Simpsonville First Baptist Church<\/em>.<\/div>\n<\/div><\/div><\/div><\/div><div id=\"pgc-146-6-1\"  class=\"panel-grid-cell\" ><div id=\"panel-146-6-1-0\" class=\"so-panel widget widget_sow-slider panel-first-child panel-last-child\" data-index=\"5\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-slider so-widget-sow-slider-default-53fd0f98de19-146\"\n\t\t\t\n\t\t><div class=\"sow-slider-base\" style=\"display: none\"><ul\n\t\t\t\t\tclass=\"sow-slider-images\"\n\t\t\t\t\tdata-settings=\"{&quot;pagination&quot;:true,&quot;speed&quot;:800,&quot;timeout&quot;:8000,&quot;paused&quot;:false,&quot;pause_on_hover&quot;:false,&quot;swipe&quot;:true,&quot;nav_always_show_desktop&quot;:&quot;&quot;,&quot;nav_always_show_mobile&quot;:&quot;&quot;,&quot;breakpoint&quot;:&quot;780px&quot;,&quot;unmute&quot;:false,&quot;anchor&quot;:null}\"\n\t\t\t\t\t\t\t\t\t>\t\t<li class=\"sow-slider-image\" style=\"\" >\n\t\t\t\t\t\t<div class=\"sow-slider-image-container\">\n\t\t\t\t<div class=\"sow-slider-image-wrapper\" style=\"max-width: 3072px\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"sow-slider-image-foreground-wrapper\">\n\t\t\t\t\t\t<img width=\"3072\" height=\"2304\" src=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Simpsonville-First-Baptist-Church-Front-View.jpg\" class=\"sow-slider-foreground-image skip-lazy\" alt=\"\" decoding=\"async\" loading=\"eager\" style=\"\" srcset=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Simpsonville-First-Baptist-Church-Front-View.jpg 3072w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Simpsonville-First-Baptist-Church-Front-View-300x225.jpg 300w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Simpsonville-First-Baptist-Church-Front-View-1024x768.jpg 1024w\" sizes=\"(max-width: 3072px) 100vw, 3072px\" \/>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/li>\n\t\t\t\t<li class=\"sow-slider-image\" style=\"\" >\n\t\t\t\t\t\t<div class=\"sow-slider-image-container\">\n\t\t\t\t<div class=\"sow-slider-image-wrapper\" style=\"max-width: 3072px\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"sow-slider-image-foreground-wrapper\">\n\t\t\t\t\t\t<img width=\"3072\" height=\"2304\" src=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Simpsonville-First-Baptist-Church-Full-View.jpg\" class=\"sow-slider-foreground-image skip-lazy\" alt=\"\" decoding=\"async\" loading=\"eager\" style=\"\" srcset=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Simpsonville-First-Baptist-Church-Full-View.jpg 3072w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Simpsonville-First-Baptist-Church-Full-View-300x225.jpg 300w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Simpsonville-First-Baptist-Church-Full-View-1024x768.jpg 1024w\" sizes=\"(max-width: 3072px) 100vw, 3072px\" \/>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/li>\n\t\t\t\t<li class=\"sow-slider-image\" style=\"\" >\n\t\t\t\t\t\t<div class=\"sow-slider-image-container\">\n\t\t\t\t<div class=\"sow-slider-image-wrapper\" style=\"max-width: 3072px\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"sow-slider-image-foreground-wrapper\">\n\t\t\t\t\t\t<img width=\"3072\" height=\"2304\" src=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Simpsonville-First-Baptist-Church-Lobby.jpg\" class=\"sow-slider-foreground-image skip-lazy\" alt=\"\" decoding=\"async\" loading=\"eager\" style=\"\" srcset=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Simpsonville-First-Baptist-Church-Lobby.jpg 3072w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Simpsonville-First-Baptist-Church-Lobby-300x225.jpg 300w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Simpsonville-First-Baptist-Church-Lobby-1024x768.jpg 1024w\" sizes=\"(max-width: 3072px) 100vw, 3072px\" \/>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/li>\n\t\t\t\t<li class=\"sow-slider-image\" style=\"\" >\n\t\t\t\t\t\t<div class=\"sow-slider-image-container\">\n\t\t\t\t<div class=\"sow-slider-image-wrapper\" style=\"max-width: 3072px\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"sow-slider-image-foreground-wrapper\">\n\t\t\t\t\t\t<img width=\"3072\" height=\"2304\" src=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Simpsonville-First-Baptist-Church-Sanctuary.jpg\" class=\"sow-slider-foreground-image skip-lazy\" alt=\"\" decoding=\"async\" loading=\"eager\" style=\"\" srcset=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Simpsonville-First-Baptist-Church-Sanctuary.jpg 3072w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Simpsonville-First-Baptist-Church-Sanctuary-300x225.jpg 300w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Simpsonville-First-Baptist-Church-Sanctuary-1024x768.jpg 1024w\" sizes=\"(max-width: 3072px) 100vw, 3072px\" \/>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/li>\n\t\t<\/ul>\t\t\t\t<ol class=\"sow-slider-pagination\">\n\t\t\t\t\t\t\t\t\t\t\t<li><a href=\"#\" data-goto=\"0\" aria-label=\"display slide 1\"><\/a><\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li><a href=\"#\" data-goto=\"1\" aria-label=\"display slide 2\"><\/a><\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li><a href=\"#\" data-goto=\"2\" aria-label=\"display slide 3\"><\/a><\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li><a href=\"#\" data-goto=\"3\" aria-label=\"display slide 4\"><\/a><\/li>\n\t\t\t\t\t\t\t\t\t<\/ol>\n\n\t\t\t\t<div class=\"sow-slide-nav sow-slide-nav-next\">\n\t\t\t\t\t<a href=\"#\" data-goto=\"next\" aria-label=\"next slide\" data-action=\"next\">\n\t\t\t\t\t\t<em class=\"sow-sld-icon-thin-right\"><\/em>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\n\t\t\t\t<div class=\"sow-slide-nav sow-slide-nav-prev\">\n\t\t\t\t\t<a href=\"#\" data-goto=\"previous\" aria-label=\"previous slide\" data-action=\"prev\">\n\t\t\t\t\t\t<em class=\"sow-sld-icon-thin-left\"><\/em>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div><\/div><\/div><\/div><\/div><div id=\"pg-146-7\"  class=\"panel-grid panel-no-style\" ><div id=\"pgc-146-7-0\"  class=\"panel-grid-cell panel-grid-cell-empty panel-grid-cell-mobile-last\" ><\/div><div id=\"pgc-146-7-1\"  class=\"panel-grid-cell panel-grid-cell-empty\" ><\/div><\/div><div id=\"pg-146-8\"  class=\"panel-grid panel-no-style\" ><div id=\"pgc-146-8-0\"  class=\"panel-grid-cell panel-grid-cell-empty panel-grid-cell-mobile-last\" ><\/div><div id=\"pgc-146-8-1\"  class=\"panel-grid-cell panel-grid-cell-empty\" ><\/div><\/div><div id=\"pg-146-9\"  class=\"panel-grid panel-no-style\" ><div id=\"pgc-146-9-0\"  class=\"panel-grid-cell\" ><div id=\"panel-146-9-0-0\" class=\"so-panel widget widget_black-studio-tinymce widget_black_studio_tinymce panel-first-child panel-last-child\" data-index=\"6\" ><div class=\"panel-widget-style panel-widget-style-for-146-9-0-0\" ><h3 class=\"widget-title\">Calvary Baptist Church<\/h3><div class=\"textwidget\"><div data-canvas-width=\"438.9844773670589\">\n<div style=\"text-align: justify;\" data-canvas-width=\"481.50086671235306\">The Calvary Baptist Church project consisted of the construction of a 48,475 SF, 2-story facility which included a 1450 seat sanctuary with adjoining fellowship spaces. Peritus Engineers\u2019 participation in the project included comprehensive engineering design of the HVAC and plumbing systems.\u00a0 The HVAC design included the following systems: split system heat pumps, split system air conditioners, roof top gas\u00a0 fired air conditioners and a roof top variable volume unit.\u00a0 The plumbing design included multiple toilet areas, baptistery, classrooms and roof drainage systems.<\/div>\n<\/div>\n<div style=\"text-align: justify;\" data-canvas-width=\"481.50086671235306\">\u00a0<\/div>\n<div style=\"text-align: justify;\" data-canvas-width=\"481.50086671235306\"><em>Photos provided courtesy of LS3P<\/em>.<\/div>\n<\/div><\/div><\/div><\/div><div id=\"pgc-146-9-1\"  class=\"panel-grid-cell\" ><div id=\"panel-146-9-1-0\" class=\"so-panel widget widget_sow-slider panel-first-child panel-last-child\" data-index=\"7\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-slider so-widget-sow-slider-default-53fd0f98de19-146\"\n\t\t\t\n\t\t><div class=\"sow-slider-base\" style=\"display: none\"><ul\n\t\t\t\t\tclass=\"sow-slider-images\"\n\t\t\t\t\tdata-settings=\"{&quot;pagination&quot;:true,&quot;speed&quot;:800,&quot;timeout&quot;:8000,&quot;paused&quot;:false,&quot;pause_on_hover&quot;:false,&quot;swipe&quot;:true,&quot;nav_always_show_desktop&quot;:&quot;&quot;,&quot;nav_always_show_mobile&quot;:&quot;&quot;,&quot;breakpoint&quot;:&quot;780px&quot;,&quot;unmute&quot;:false,&quot;anchor&quot;:null}\"\n\t\t\t\t\t\t\t\t\t>\t\t<li class=\"sow-slider-image\" style=\"\" >\n\t\t\t\t\t\t<div class=\"sow-slider-image-container\">\n\t\t\t\t<div class=\"sow-slider-image-wrapper\" style=\"max-width: 1024px\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"sow-slider-image-foreground-wrapper\">\n\t\t\t\t\t\t<img width=\"1024\" height=\"819\" src=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Calvary-Baptist-Church-1.jpg\" class=\"sow-slider-foreground-image skip-lazy\" alt=\"\" decoding=\"async\" loading=\"eager\" style=\"\" srcset=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Calvary-Baptist-Church-1.jpg 1024w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Calvary-Baptist-Church-1-300x240.jpg 300w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/li>\n\t\t\t\t<li class=\"sow-slider-image\" style=\"\" >\n\t\t\t\t\t\t<div class=\"sow-slider-image-container\">\n\t\t\t\t<div class=\"sow-slider-image-wrapper\" style=\"max-width: 1024px\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"sow-slider-image-foreground-wrapper\">\n\t\t\t\t\t\t<img width=\"1024\" height=\"819\" src=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Calvary-Baptist-Church-3.jpg\" class=\"sow-slider-foreground-image skip-lazy\" alt=\"\" decoding=\"async\" loading=\"eager\" style=\"\" srcset=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Calvary-Baptist-Church-3.jpg 1024w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Calvary-Baptist-Church-3-300x240.jpg 300w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/li>\n\t\t\t\t<li class=\"sow-slider-image\" style=\"\" >\n\t\t\t\t\t\t<div class=\"sow-slider-image-container\">\n\t\t\t\t<div class=\"sow-slider-image-wrapper\" style=\"max-width: 1024px\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"sow-slider-image-foreground-wrapper\">\n\t\t\t\t\t\t<img width=\"1024\" height=\"819\" src=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Calvary-Baptist-Church-3.jpg\" class=\"sow-slider-foreground-image skip-lazy\" alt=\"\" decoding=\"async\" loading=\"eager\" style=\"\" srcset=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Calvary-Baptist-Church-3.jpg 1024w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Calvary-Baptist-Church-3-300x240.jpg 300w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/li>\n\t\t\t\t<li class=\"sow-slider-image\" style=\"\" >\n\t\t\t\t\t\t<div class=\"sow-slider-image-container\">\n\t\t\t\t<div class=\"sow-slider-image-wrapper\" style=\"max-width: 1024px\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"sow-slider-image-foreground-wrapper\">\n\t\t\t\t\t\t<img width=\"1024\" height=\"820\" src=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Calvary-Baptist-Church-2.jpg\" class=\"sow-slider-foreground-image skip-lazy\" alt=\"\" decoding=\"async\" loading=\"eager\" style=\"\" srcset=\"https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Calvary-Baptist-Church-2.jpg 1024w, https:\/\/www.peritusengineers.com\/wp-content\/uploads\/2015\/09\/Calvary-Baptist-Church-2-300x240.jpg 300w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/li>\n\t\t<\/ul>\t\t\t\t<ol class=\"sow-slider-pagination\">\n\t\t\t\t\t\t\t\t\t\t\t<li><a href=\"#\" data-goto=\"0\" aria-label=\"display slide 1\"><\/a><\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li><a href=\"#\" data-goto=\"1\" aria-label=\"display slide 2\"><\/a><\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li><a href=\"#\" data-goto=\"2\" aria-label=\"display slide 3\"><\/a><\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li><a href=\"#\" data-goto=\"3\" aria-label=\"display slide 4\"><\/a><\/li>\n\t\t\t\t\t\t\t\t\t<\/ol>\n\n\t\t\t\t<div class=\"sow-slide-nav sow-slide-nav-next\">\n\t\t\t\t\t<a href=\"#\" data-goto=\"next\" aria-label=\"next slide\" data-action=\"next\">\n\t\t\t\t\t\t<em class=\"sow-sld-icon-thin-right\"><\/em>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\n\t\t\t\t<div class=\"sow-slide-nav sow-slide-nav-prev\">\n\t\t\t\t\t<a href=\"#\" data-goto=\"previous\" aria-label=\"previous slide\" data-action=\"prev\">\n\t\t\t\t\t\t<em class=\"sow-sld-icon-thin-left\"><\/em>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div><\/div><\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Peritus has been involved with multiple projects at the First Baptist Church in Greenville.\u00a0 The chilled water project included improvements to the existing chilled water distribution system and integration of a new chilled water plant to supplement the existing main &hellip; <a class=\"kt-excerpt-readmore\" href=\"https:\/\/www.peritusengineers.com\/index.php\/recent-projects\/faith-based\/\" aria-label=\"Faith Based\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":21,"menu_order":2,"comment_status":"closed","ping_status":"closed","template":"page-fullwidth.php","meta":{"kt_blocks_editor_width":""},"_links":{"self":[{"href":"https:\/\/www.peritusengineers.com\/index.php\/wp-json\/wp\/v2\/pages\/146"}],"collection":[{"href":"https:\/\/www.peritusengineers.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.peritusengineers.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.peritusengineers.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.peritusengineers.com\/index.php\/wp-json\/wp\/v2\/comments?post=146"}],"version-history":[{"count":13,"href":"https:\/\/www.peritusengineers.com\/index.php\/wp-json\/wp\/v2\/pages\/146\/revisions"}],"predecessor-version":[{"id":365,"href":"https:\/\/www.peritusengineers.com\/index.php\/wp-json\/wp\/v2\/pages\/146\/revisions\/365"}],"up":[{"embeddable":true,"href":"https:\/\/www.peritusengineers.com\/index.php\/wp-json\/wp\/v2\/pages\/21"}],"wp:attachment":[{"href":"https:\/\/www.peritusengineers.com\/index.php\/wp-json\/wp\/v2\/media?parent=146"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}